Installation Animation

Pool Installation Steps

  1. Pool Layout is marked
  2. Digging Begins
  3. Hole is shaped and prepared for the pool
  4. The pool is lowered into place
  5. The pool is filled with water
  6. Proper plumbing and equipment is installed
  7. The concrete is poured around the pool and its foundation
  8. The pool is now ready to be enjoyed!